Once More, With (Better) Foundations
Saturday 31 March 2007
Building starts (sort of)
Today a builder bricked up the kitchen into its original shape and installed what will be the temporary back door after the demolition.
Not all the residents of 265 are pleased, however:
No comments:
Post a Comment
Newer Post
Older Post
Home
Subscribe to:
Post Comments (Atom)
Blog Archive
►
2016
(8)
►
August
(3)
►
July
(1)
►
May
(3)
►
April
(1)
►
2014
(3)
►
May
(3)
►
2011
(6)
►
June
(1)
►
May
(4)
►
January
(1)
►
2010
(42)
►
October
(2)
►
September
(15)
►
July
(2)
►
May
(1)
►
April
(14)
►
March
(7)
►
January
(1)
►
2009
(2)
►
October
(1)
►
February
(1)
►
2008
(159)
►
December
(4)
►
November
(13)
►
October
(18)
►
September
(21)
►
August
(17)
►
July
(14)
►
June
(18)
►
May
(10)
►
April
(16)
►
March
(11)
►
February
(12)
►
January
(5)
▼
2007
(25)
►
December
(2)
►
November
(3)
►
October
(1)
►
September
(2)
►
August
(2)
►
July
(3)
►
June
(2)
►
May
(1)
►
April
(4)
▼
March
(3)
Building starts (sort of)
Just mucking about now
Getting closer
►
February
(2)
Topics
Kitchen
Renovations
Garden
Construction
Plumbing
Wiring
Heating
Hall
Doors
Foundations
Patio
Living Room
En Suite
Exterior walls
Library
Utility room
Bathroom
Decoration
Master Bedroom
Roof
Windows
Drawings
TV Room
Floors
Landing
Project management
Downstairs WC
Demolition
Tiles
Dressing Room
Drains
Tendering
Attic
Large Front Bedroom
Planning
Large Back Bedroom
Small Front Bedroom
Contract
Stairs
Site safety
Written by
Dara
John
No comments:
Post a Comment