... in a good way and in a not so good way.
Today the revised drawings arrived from the engineer. They're pretty much the same as the ones the architect did for us, with some extra technical details about the construction and the foundations. Once we've gone through the bundle of papers and are happy everything's OK, we'll be able to send this out to builders for tendering.
The other movement is something we noticed last week when the back door stopped closing. It looks like the extension has shifted slightly to the rear and side. I really think we'll need to have it down before the frost starts arriving. We don't want the demolition team beaten to it by the winter.
Today the revised drawings arrived from the engineer. They're pretty much the same as the ones the architect did for us, with some extra technical details about the construction and the foundations. Once we've gone through the bundle of papers and are happy everything's OK, we'll be able to send this out to builders for tendering.
The other movement is something we noticed last week when the back door stopped closing. It looks like the extension has shifted slightly to the rear and side. I really think we'll need to have it down before the frost starts arriving. We don't want the demolition team beaten to it by the winter.
