Anyway, we got back to find the glazier had been, and the front door looks great, with lots of light now coming into the hall:
The two upstairs doors have also been glazed. Here's the bathroom:
Painting started today. The master bedroom is done and only one wall remains to be painted in the dressing room:
Downstairs the kitchen floor has been fully tiled and the room is providing refuge for our beleaguered living room furniture:
This is because the living room is well on its way to being floored, with the fireplace removed and the space around it ready to be tidied up:
Outside, the side passage dashing has been completed:
I wonder why we're still looking at bare blocks above, around the bedroom window. That'll be next, I'd imagine
No comments:
Post a Comment