There's still loads to do though: two radiators and the understairs toilet suite have yet to arrive on site, the phones still aren't working properly, there are parts to be added to the water heating system, the electricity supply and meter have to be moved and there's a mysterious electrical hum and tick in the living room which no-one has been able to identify, let alone fix. I really can't see these being resolved by Friday, never mind all the painting still to be done. Oh, and the floor sanding.
The tiler has been back, however, and tiled the walls of our bathroom:
The toilet went in today but hasn't been plumbed yet.
We still need the builders to make a side panel for the bath which will be tiled as well.
Down in the kitchen, the hob isn't so much installed as just dropped into its hole in the worktop:
Still, progress is progress.
But the most promising addition today is this hole that has been bored at the base of the utility room wall:
It's the vent pipe for the tumble drier, which raises hopes of having home laundry facilities at some point in the near future. Hooray! Tomorrow we're off to choose units for this area. And probably talk about wardrobes as well.