skip to main
|
skip to sidebar
Once More, With (Better) Foundations
Sunday 26 June 2011
Back where we started
And so we return to where we were last autumn: the new gates are installed.
Very slightly different to the previous set, being less decorative.
And that concludes this section of work. There might be more happening in the autumn, however.
No comments:
Post a Comment
Newer Post
Older Post
Home
Subscribe to:
Post Comments (Atom)
Blog Archive
►
2016
(8)
►
August
(3)
►
July
(1)
►
May
(3)
►
April
(1)
►
2014
(3)
►
May
(3)
▼
2011
(6)
▼
June
(1)
Back where we started
►
May
(4)
►
January
(1)
►
2010
(42)
►
October
(2)
►
September
(15)
►
July
(2)
►
May
(1)
►
April
(14)
►
March
(7)
►
January
(1)
►
2009
(2)
►
October
(1)
►
February
(1)
►
2008
(159)
►
December
(4)
►
November
(13)
►
October
(18)
►
September
(21)
►
August
(17)
►
July
(14)
►
June
(18)
►
May
(10)
►
April
(16)
►
March
(11)
►
February
(12)
►
January
(5)
►
2007
(25)
►
December
(2)
►
November
(3)
►
October
(1)
►
September
(2)
►
August
(2)
►
July
(3)
►
June
(2)
►
May
(1)
►
April
(4)
►
March
(3)
►
February
(2)
Topics
Kitchen
Renovations
Garden
Construction
Plumbing
Wiring
Heating
Hall
Doors
Foundations
Patio
Living Room
En Suite
Exterior walls
Library
Utility room
Bathroom
Decoration
Master Bedroom
Roof
Windows
Drawings
TV Room
Floors
Landing
Project management
Downstairs WC
Demolition
Tiles
Dressing Room
Drains
Tendering
Attic
Large Front Bedroom
Planning
Large Back Bedroom
Small Front Bedroom
Contract
Stairs
Site safety
Written by
Dara
John
No comments:
Post a Comment